Plzen vs Bate Borisov: result 1-1 and analysis
UEFA Champions LeagueGroup stage - 1Kick-off on September 13, 2011 at 06:45 PM (UTC)Doosan Aréna, Plzeň
Full time
What was the result of Plzen vs Bate Borisov?
Plzen and Bate Borisov drew 1-1 on September 13, 2011.
Goalscorers
- 45′Marek BakošPlzen
- 69′R. BressanBate Borisov
What is the recent form of both teams?
Over their last 6 matches in all competitions, Plzen have 6 wins, 0 draws and 0 defeats; Bate Borisov have 3, 3 and 0.
The competition is shown for every match: in pre-season, several of these games are friendlies.
| Date | Opponent | Score | Competition |
|---|---|---|---|
| Aug 24, 2011 | FC Copenhagen(home) | 2-1 | UEFA Champions League |
| Aug 16, 2011 | FC Copenhagen(away) | 3-1 | UEFA Champions League |
| Aug 3, 2011 | Rosenborg(home) | 3-2 | UEFA Champions League |
| Jul 27, 2011 | Rosenborg(away) | 1-0 | UEFA Champions League |
| Jul 19, 2011 | Pyunik Yerevan(home) | 5-1 | UEFA Champions League |
| Date | Opponent | Score | Competition |
|---|---|---|---|
| Aug 24, 2011 | Sturm Graz(away) | 2-0 | UEFA Champions League |
| Aug 16, 2011 | Sturm Graz(home) | 1-1 | UEFA Champions League |
| Aug 2, 2011 | Ekranas(home) | 3-1 | UEFA Champions League |
| Jul 26, 2011 | Ekranas(away) | 0-0 | UEFA Champions League |
| Jul 19, 2011 | Linfield(home) | 2-0 | UEFA Champions League |
How many goals should we expect?
Plzen score 3.0 and concede 0.8 goals per match over their last 6; Bate Borisov score 1.5 and concede 0.5.
| Club | Goals scored / match | Goals conceded / match | Clean sheets | Both teams scored | Over 2.5 goals |
|---|---|---|---|---|---|
| Plzen | 3.0 | 0.8 | 2 | 4/6 | 5/6 |
| Bate Borisov | 1.5 | 0.5 | 3 | 3/6 | 1/6 |
Over the last 6 matches in all competitions.
How does Footlab compute this prediction?
The model combines both teams' Elo ratings (anchored by competition pool), their recent form weighted by opponent strength, home advantage and a Poisson matrix for scorelines. Its accuracy is measured continuously on the predictions actually published. Methodology and measured accuracy