MSP Batna vs Paradou AC: result 1-0 and analysis
Ligue 2Regular Season - 7Kick-off on October 21, 2011 at 05:00 PM (UTC)Stade du 1er novembre 1954, Batna
Full time
What was the result of MSP Batna vs Paradou AC?
MSP Batna won 1-0 on October 21, 2011.
What is the recent form of both teams?
Over their last 6 matches in all competitions, MSP Batna have 2 wins, 2 draws and 2 defeats; Paradou AC have 1, 3 and 2.
The competition is shown for every match: in pre-season, several of these games are friendlies.
| Date | Opponent | Score | Competition |
|---|---|---|---|
| Oct 14, 2011 | MO Constantine(away) | 1-2 | Ligue 2 |
| Oct 7, 2011 | Mérouana(home) | 1-0 | Ligue 2 |
| Sep 30, 2011 | Mostaganem(away) | 0-0 | Ligue 2 |
| Sep 23, 2011 | US Biskra(home) | 2-1 | Ligue 2 |
| Sep 16, 2011 | Bordj BOU Arreridj(away) | 0-1 | Ligue 2 |
| Date | Opponent | Score | Competition |
|---|---|---|---|
| Oct 14, 2011 | USM Annaba(home) | 1-1 | Ligue 2 |
| Oct 7, 2011 | USM Bel Abbes(away) | 2-0 | Ligue 2 |
| Sep 30, 2011 | Olympique Medea(home) | 1-1 | Ligue 2 |
| Sep 23, 2011 | RC Kouba(away) | 1-1 | Ligue 2 |
| Sep 16, 2011 | MO Bejaia(home) | 1-3 | Ligue 2 |
How many goals should we expect?
MSP Batna score 0.7 and concede 0.7 goals per match over their last 6; Paradou AC score 1.2 and concede 1.3.
| Club | Goals scored / match | Goals conceded / match | Clean sheets | Both teams scored | Over 2.5 goals |
|---|---|---|---|---|---|
| MSP Batna | 0.7 | 0.7 | 3 | 2/6 | 2/6 |
| Paradou AC | 1.2 | 1.3 | 1 | 5/6 | 2/6 |
Over the last 6 matches in all competitions.
Where do both teams sit in the table?
| # | Club | P | W | D | L | GF | GA | Pts |
|---|---|---|---|---|---|---|---|---|
| 9 | MSP Batna | 30 | 9 | 9 | 12 | 32 | 36 | 36 |
How does Footlab compute this prediction?
The model combines both teams' Elo ratings (anchored by competition pool), their recent form weighted by opponent strength, home advantage and a Poisson matrix for scorelines. Its accuracy is measured continuously on the predictions actually published. Methodology and measured accuracy